[1]
Total Found (Water Supply and Drainage) : 136
Number
Date
Abstract
Download
18-02-2020
Salem City Municipal Corporation - FORMATION OF DIVERSIONAL CHANNEL TO AVOID MIXING OF SEWAGE WATER IN PALLAPATTY LAKE IN SALEM CITY MUNICIPAL CORPORATION.
17-02-2020
Salem City Municipal Corporation - Providing water distribution system for 24 x 7 supply in Salem Smart City Area (ABD and Adjoining areas) Under Salem Smart City Limited.
06-02-2020
TAMILNADU WATER SUPPLY AND DRAINAGE BOARD - CWSS to Tambaram-Pallavaram in Chengalpattu District – Construction of pipe carrying bridge in the LS 2619 m to LS 2769 m for the length of 150m in Package IV in Shifting the 600mm AC gravity main with 600mm DI S/S pipe from Mannivakkam junction to Keelpadappai - under Outlived Programme- Period of completion – 3 Months.
21-01-2020
SALEM CITY MUNICIPAL CORPORATION - Improvement of Dedicated Salem Water Supply Scheme by Providing Variable Frequency Drives in Treated Water Pumping Station at Thottilpatti, Mettur Dam.
10-01-2020
Anaimalai Town Panchayat - Providing CC Pavement with construction of side Drain and Culvert at Uppliyar Street, Ramapuram Cross Street and Arasapalli Street in Anaimalai Town Panchay.
07-01-2020
Municipal Administration and Water Supply - Providing Electro Chlorination Arrangements by using common salt in the Group sumps of CWSS to 755 Rural Habitations in Virudhunagar District including maintenance for a period of 12 months (Period of completion – 3 months).
26-11-2019
TAMILNADU WATER SUPPLY AND DRAINAGE BOARD - Replacement of the damaged age old 700mm dia PSC Pipes from Ammapet Booster Station to Mettupatty BPT at LS 0 m to 12564 m with 711mm size MS Pipes under CWSS to Attur, Narasingapuram Municipalities, 20 Town Panchayats and 1345 Rural habitations in 12 Unions in Salem District (Completion period : 9 months, Trial Run : 6 months and Free Maintenance : 6 Months).
09-07-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - Providing Pumping Main of 750mm dia CI LA class pipe from the Main Pumping station at Beach road to the Sewage Treatment Plant at Tharuvaikulam for Under Ground Sewerage Scheme to Thoothukudi Corporation in Thoothukudi District of Tamilnadu.
05-07-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - PWSS to Kandupatti and Keelakottai-H in Kalayarkoil Union and Siluvinipatti in Sivagangai Union.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC box type storm of size 900 x 900mm along Madhavaram High Road from Demontey Avenue to Existing SWD opposite to Indian Oil Petrol Bunk in Dn.31, Zone - III.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC box type storm of size 600 x 750mm along Ravi Garden 1st and 2nd Street from Dead End to Ravi Garden Main Street in Dn.34, Zone - IV.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC box type storm of size 600 x 750mm along Kaladipet Market Lane from Thiruvottiyur High Road to Suryanaryanan Street in Dn.11, Zone I.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC box type storm of size 600 x 750mm along Esani Moorthy Koil Street from Thiruvottiyur High Road to Suryanarayanan Street in Dn.9, Zone - I.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC box type storm of size 600 x 750mm along Ellaiamman Koil Street from Thiruvottiyur High Road to Suryanaryanan Street in Dn.11, Zone - I.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC box type storm of size 600 x 750mm along Appar Samy Koil Street from Thiruvottiyur High Road to Suryanaryanan Street in Dn.9, Zone - I.
02-07-2013
CORPORATION OF CHENNAI - Construction of RCC Box type storm water drain of size 600 x 750mm along Peer Bhailvan Durga Road from Thiruvottiyur High Road to Suryanaryanan Street in Dn.14, Zone – I.
02-07-2013
CORPORATION OF CHENNAI - Demolition of existing strom water drain of size 900 x 900mm and Reconstruction of RCC Box type storm water drain of size 900 x 900mm along Stella Marys College from Chokkalingam Nagar to Poes Salai in Dn-119, Zone-IX.
02-07-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Rerouting of collapsed sewer in Lloyds Road to Ram Nagar pumping station in Depot 120 in Area-IX.
28-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Automation of 42 sewage pumping stations in CMWSS Board - Package - 3.
28-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Automation of 37 sewage pumping stations in CMWSS Board - Package - 2.
28-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Automation of 37 sewage pumping stations in CMWSS Board - Package - 1.
26-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Automation of 35 sewage pumping stations in CMWSS Board - Package - 5.
26-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Automation of 36 sewage pumping stations in CMWSS Board - Package - 4.
24-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Inline Quality Monitoring System in CMWSS Board.
20-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Providing Comprehensive Water Supply Scheme to Maduravoyal - PACKAGE - II – Supplying and laying MS encasing pipe across NH road (NH 4) at locations by pulling / pushing / jacking method (Trenchless).
19-06-2013
பேரூராட்சிகள் இயக்கம் - ஆலங்குளம் தேர்வுநிலை பேரூராட்சி - 7வது வார்டு கெங்கை மைதானம் பகுதியில் 30000லி கொள்ளளவு கொண்ட மேல்நிலை நீர்த்தேக்க தொட்டி அமைத்து அதற்கு தண்ணீர் தொட்டியான்குளம் அருகில் உள்ள கிணற்றினை ஆழப்படுத்தி தண்ணீரினை பம்பிங் செய்து பைப்லைன் அமைத்தல் பணி.
18-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Providing Comprehensive Sewerage Scheme to Maduravoyal - Package I – Supplying and laying MS encasing pipe across NH road (NH 4) at 2 locations by pulling / pushing / jacking method (Trenchless).
13-06-2013
CORPORATION OF CHENNAI - Package-4A (18 Roads) - Integrated road development including Storm water drain,Ducts for cables & Foot path at various Roads in Ward -4 & 7,Zone I under Chennai Mega city Development Mission Fund.
13-06-2013
CORPORATION OF CHENNAI - Package-2A (29 Road works) - Integrated road development including Storm water drain,Ducts for cables & Foot path at various Roads in Ward -4,6& 7, Zone I under Chennai Mega city Development Mission Fund.
10-06-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - Providing Water Supply improvement scheme to Ayyampettai Town Panchayat in Thanjavur District.
10-06-2013
பேரூராட்சிகள் இயக்கம் - முளகுமூடு பேரூராட்சி - பைத்தாக்குளத்தில் திறந்த வெளிக்கிணறு வைத்து மோட்டார் பொருத்துதல்.
04-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Improvements to existing Chetpet sewage pumping station - Electrical & Mechanical works and pumping main.
04-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Supplying, laying, jointing and testing of 450mm dia CI pipe line for the replacement of the existing 450 mm dia CI pumping main from Lake Area Sewage Pumping Station to Erukkencherry Sewage Pumping Station in Depot-36, Area-IV.
04-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Improvement works to existing Chetpet Sewage Pumping Station - Civil Works.
03-06-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - Construction of road side pumping station and allied works at Parthasarathy (N) street in Depot 114, Area-IX-Part-I.
30-05-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS to Pandamangalam Town Panchayat in Namakkal District- Supply, delivery, erection and commissioning of open well submersible pump sets at Head works site, Supply, delivery, Laying and Jointing.
16-05-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - For Engaging Contract Labourers in the Maintenance of following Combined Water Supply Schemes (CWSS) in Madurai, Theni, Sivagangai, Pudukottai and Ramnad Districts for the year 2013-2014, 2014-2015, 2015-2016 of 3 years (PACKAGE No. VI).
16-05-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - For Engaging Contract Labourers in the Maintenance of following Combined Water Supply Schemes (CWSS) in Madurai, Theni, Sivagangai, Pudukottai and Ramnad Districts for the year 2013-2014, 2014-2015, 2015-2016 of 3 years (PACKAGE NO. V)
16-05-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - Operation and Maintenance of CWSS by Engaging Contract Labourers for PACKAGE IV(Ramnad CWSS) of Combined Water Supply Schemes to 5 Municipalities,11 Town Panchayats and 3163 Rural habitations in Ramanathapuram, Sivagangai and Pudukottai District for the year 2013-2014,2014-2015,2015-2016 of 3 years.
16-05-2013
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - For Engaging Contract Labourers in the Maintenance of Ramnad Combined Water Supply Schemes (PACKAGE VII) in Ramnad District for the year 2013-2014,2014-2015, 2015-2016 of 3 years.
15-05-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROVIDING WATER SUPPLY IMPROVEMENT SCHEME TO PALLAVARAM MUNICIPALITY COVERING HEAD WORKS ,FEEDER MAIN, UGT/OHT AND DISTRIBUTION SYSTEM IN ZONES 1 to 3 (PACKAGE –III).
15-05-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROVIDING WATER SUPPLY IMPROVEMENT SCHEME TO PALLAVARAM MUNICIPALITY COVERING HEAD WORKS ,FEEDER MAIN, UGT/OHT AND DISTRIBUTION SYSTEM IN ZONES 9 to 16 (PACKAGE –II).
15-05-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROVIDING WATER SUPPLY IMPROVEMENT SCHEME TO PALLAVARAM MUNICIPALITY COVERING HEADWORKS ,FEEDER MAIN, UGT/OHT AND DISTRIBUTION SYSTEM IN ZONES 4 to 8 (PACKAGE - I).
15-05-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROVIDING WATER SUPPLY IMPROVEMENT SCHEME TO PAMMAL MUNICIPALITY COVERING HEADWORKS, FEEDER MAIN,OHT AND DISTRIBUTION SYSTEM.
09-04-2013
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OPERATION AND MAINTENANCE OF SEWAGE PUMPING STATIONS (HT RELAY, HT 3 SHIFTS, LT 3 SHIFTS, LT 2 SHIFTS, LT ROAD SIDE) AT VARIOUS LOCATIONS IN CHENNAI CITY FOR 3 YEARS.
06-12-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF VELACHERY WATER DISTRIBUTION STATION IN AREA-XB FOR THREE YEARS.
28-11-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO METTUR MUNICIPALITY IN SALEM DISTRICT - CONSTRUCTION OF COLLECTION WELL-CUM-PUMPHOUSE, FOOT BRIDGE, SUPPLY, DELIVERY, LAYING, JOINTING AND TESTING OF RAW WATER MAIN, CLEAR WATER MAIN, DISTRIBUTION SYSTEM - CONSTRUCTION OF FULL SCALE TREATMENT PLANT OF CAPACITY 3.60 MLD, SUMP PUMPROOM, SERVICE RESERVOIRS, SUPPLY, DELIVERY AND ERECTION OF PUMPSET ETC., COMPLETE INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
22-11-2010
MUNICIPAL ADMINISTRATION COMMISSIONERATE (CMA) - OPERATION AND MAINTENANCE OF UNDER GROUND SEWERAGE SCHEME(UGSS) IN ALANDUR MUNICIPALITY.
18-11-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROVIDING SEWERAGE FACILITIES FOR AVADI MUNICIPALITY CONSTRUCTION OF EFFLUENT PUMPING STATION AND EFFLUENT PUMPING MAIN AT PARUTHIPATTU STP.
04-11-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) – PROVIDING ALTERNATE SEWERAGE FACILITIES TO THE AFFECTED COLONIES BY BACKFLOW OF STORM WATER MIXED WITH SEWAGE IN ADJOINING AREAS OF NILAMANGAI NAGAR IN ALANDUR MUNICIPALITY.
04-11-2010
பேரூராட்சிகள் இயக்கம் - திருக்கழுக்குன்றம் பேரூராட்சி - சன்னதி தெரு-அக்ரஹாரம் தெரு இடையில் உள்ள லட்சுமி தீர்த்த குளத்தினை சீரமைத்தல்.
27-10-2010
பேரூராட்சிகள் இயக்கம் -உளுந்தூர்பேட்டை பேரூராட்சி - ரயில்வே கேட் அருகில் கெடிலம் பைப்லைன் மாற்றி அமைத்தல்.
27-10-2010
நகராட்சி நிர்வாக இயக்குநகரம் - பம்மல் நகராட்சி - வார்டு எண். 7, 15, மற்றும் 17 ஆகிய இடங்களில் நீராதரம் உள்ள இடத்தில் 3 எண்ணிக்கையில் ஆழ்துளை கிணறுகள் அமைத்தல்.
26-10-2010
CORPORATION OF CHENNAI - DISMANTLING 600 BY 750 MM AND RECONSTRUCTION OF RCC BOX TYPE STORM WATER DRAIN OF SIZE 900 BY 900MM ALONG NALLAIAH STREET FROM BARRAKKA RD TO SUBBARAYAN MAIN ST IN DN 59,Z-IV.
26-10-2010
நகராட்சி நிர்வாக இயக்குநகரம் - வேலூர் மாநகராட்சி - கோட்டை சுற்றுச்சாலையில் மழைநீர் மற்றும் சிறுபாலம் அமைத்தல்.
22-10-2010
பேரூராட்சிகள் இயக்கம் -சோலூர் பேரூராட்சி - சோலூர் பேரூராட்சிக்குட்பட்ட தட்டனேரியில் குடிநீர் குழாய்கள் அமைத்தல்.
21-10-2010
CORPORATION OF CHENNAI - CONSTRUCTION OF SWD OF SIZE 900MMX900MM ALONG MAYOR BASUDEV 2ND STREET (MISSING LINK) FROM ARANI RANGAN ST TO MAYOR BASU DEV STREET AND IMPROVEMENT TO CMS AT CORNATION NAGAR I.
05-10-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - PROVIDING UGSS TO UDUMALPET MUNICIPALITY IN TIRUPPUR DISTRICT PACKAGE I SUPPLY DELIVERY LAYING AND JOINTING OF SEWERLINE FOR ZONE I AND ZONE II PUMPING MAIN AND HSC.
05-10-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO PUNJAIPUGALUR TOWN PANCHAYAT IN KARUR DISTRICT – CONSTRUCTION OF INFILTRATION WELL, PUMPROOM, SUPPLY, DELIVERY AND ERECTION OF PUMPSETS, SUPPLY, DELIVERY, LAYING AND JOINTING OF PUMPING MAIN, DISTRIBUTION SYSTEM AND CONSTRUCTION OF SERVICE RESERVOIR INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
05-10-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROVIDING ALTERNATE SEWERAGE FACILITIES TO THE AFFECTED COLONIES BY BACKFLOW OF STORM WATER MIXED WITH SEWAGE IN ADJOINING AREAS OF NILAMANGAI NAGAR IN ALANDUR MUNICIPALITY.
05-10-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION & MAINTENANCE OF VYASARPADI WATER DISTRIBUTION STATION FOR A PERIOD OF 3 YEARS.
27-09-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION & MAINTENANCE OF PALLIPATTU WATER DISTRIBUTION STATION IN AREA XB FOR 3 YEARS.
27-09-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF KANNAPPAR THIDAL WATER DISTRIBUTION STATION IN AREA III FOR A PERIOD OF 3 YEARS.
27-09-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO KARUR MUNICIPALITY IN KARUR DISTRICT – CONSTRUCTION OF COLLECTOR WELL-CUM-PUMPHOUSE, FOOT BRIDGE, SUMP-CUM- PUMPHOUSE, SERVICE RESERVOIR, SUPPLY, DELIVERY AND ERECTION OF PUMPSETS, SUPPLY, DELIVERY, LAYING AND JOINTING OF PUMPING MAIN, BOOSTER MAIN, FEEDER MAIN AND DISTRIBUTION SYSTEM INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
27-09-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO THANTHONI MUNICIPALITY IN KARUR DISTRICT – CONSTRUCTION OF COLLECTOR WELL-CUM-PUMPHOUSE, FOOT BRIDGE, SUMP, PUMPROOM, SERVICE RESERVOIR, SUPPLY, DELIVERY AND ERECTION OF PUMPSETS, SUPPLY, DELIVERY, LAYING AND JOINTING OF PUMPING MAIN, FEEDER MAIN AND DISTRIBUTION SYSTEM INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
27-09-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO UDHAGAI MUNICIPALITY IN NILGIRIS DISTRICT – CONSTRUCTION OF TREATMENT PLANT OF 11 MLD CAPACITY, PUMPHOUSE, GROUND LEVEL SERVICE RESERVOIR, SUPPLY, DELIVERY AND ERECTION OF PUMPSETS, SUPPLY, DELIVERY, LAYING AND JOINTING OF PUMPING MAIN, FEEDER MAIN AND DISTRIBUTION SYSTEM INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
27-09-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - CWSIS TO VELLAKOIL MUNICIPALITY, KANGEYAM TOWN PANCHAYAT AND 174 RURAL HABITATIONS IN ERODE AND TIRUPPUR DISTRICTS CONSTRUCTION OF OFF-TAKE WELL, COLLECTION WELL-CUM-PUMPHOUSE, 15.18 MLD FULL SCALE TREATMENT PLANT, SUMP, PUMPROOM, SUPPLY, DELIVERY AND ERECTION OF PUMPSETS, SUPPLY, DELIVERY, LAYING, JOINTING AND TESTING OF RAW WATER MAIN, CLEAR WATER MAIN, BOOSTER MAIN, FEEDER MAIN AND BRANCH MAIN AND DISTRIBUTION SYSTEM - CONSTRUCTION OF OVER HEAD TANK, ETC., COMPLETE INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
23-09-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF PATEL NAGAR WATER DISTRIBUTION STATION IN AREA I FOR A PERIOD OF 3 YEARS.
09-09-2010
நகராட்சி நிர்வாக இயக்குநகரம் - வேலூர் மாநகராட்சி - முத்துமாரியம்மன் தெருவில் புதியதாக ஆழ்துளை கிணறு மற்றும் மின்மோட்டார் அமைத்தல்.
07-09-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) – PROVIDING WSIS TO NANDHIVARAM – GUDUVANCHERI T.PT. IN KANCHEEPURAM DISTRICT IN TAMIL NADU – CONSTRUCTION OF SERVICES RESERVOIRS OF 2.00 LAKHS LITRES CAPACITY – 1 NO AND MAINTENANCE OF SCHEME FOR 12MONTHS .
07-09-2010
நகராட்சி நிர்வாக இயக்குநகரம் - சிதம்பரம் நகராட்சி - விழல் கட்டி பிள்ளையார் கோவில் தெருவில் மழைநீர் வடிகால் கட்டும் பணி.
06-09-2010
பேரூராட்சிகள் இயக்கம் -தாரமங்கலம் தேர்வுநிலை பேரூராட்சி - ஜலகண்டாபுரம் மெயின்ரோடு முதல் செல்வமணி வீடு குறுக்குரோடு வரை குடிநீர் பைப்லைன் மற்றும் சிமெண்ட் சாலை அமைத்தல்.
06-09-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD – UGSS TO CHIDAMBARAM MUNICIPALITY OF IN CUDDALORE DISTRICT IN TAMIL NADU, CONSTRUCTION OF GRIT WELL,SCREEN CHAMBER AND SUCTION WELL, BRICKWORK & RCC MAN HOLES AND DROP MAN HOLES, SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF NON – CLOG SUBMERSIBLE PUMP SETS.
30-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OPERATION AND MAINTENANCE OF 23 MLD CAPACITY SEWAGE TREATMENT PLANT AT KOYAMBEDU FOR 3 YEARS.
30-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT AT KODUNGAIYUR ZONE 1 FOR 3 YEARS.
30-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT AT KODUNGAIYUR ZONE II FOR 3 YEARS.
27-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - ENLARGEMENT OF SEWER MAIN AND ION OF MANHOLES AT MANDAPAM I TO VI CROSS STREET AND GUJJI I AND II STREET IN DEPOT 68 AREA V.
16-08-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - SUPPLY AND DELIVERY OF HYDRATED LIME.
12-08-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - TENDER NOTICE - PERCENTAGE TENDER SYSTEM - TURN KEY BASIS.
12-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OPERATION AND MAINTENANCE OF 23 MLD CAPACITY SEWAGE TREATMENT PLANT AT NESAPAKKAM FOR 3 YEARS.
11-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF EKKATTUTHANGAL WATER DISTRIBUTION STATION HT 3 SHIFTS FOR A PERIOD OF 3 YEARS IN AREA IX.
11-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF ALANDUR WATER DISTRIBUTION STATION HT 3 SHIFTS FOR A PERIOD OF 3 YEARS IN AUA DIVISION.
11-08-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OUTSOURCING OF OPERATION AND MAINTENANCE OF CHOOLAIMEDU WATER DISTRIBUTION STATION FOR A PERIOD OF 3 YEARS.
09-08-2010
பேரூராட்சிகள் இயக்கம் - கருமாண்டிசெல்லிபாளையம் பேரூராட்சி - வடிகால் அமைத்தல் மற்றும் 60000 லி கொள்ளளவு கொண்ட சம்ப் கட்டி சாக்கடை நீரை வெளியேற்றுதல்.
09-08-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - PROVIDING COMBINED WATER SUPPLY SCHEME TO 18 QUALITY AFFECTED HABITATIONS IN KUTHALAM UNION IN NAGAPATTINAM DISTRICT.
06-08-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO INAMKARUR MUNICIPALITY IN KARUR DISTRICT – CONSTRUCTION OF COLLECTOR WELL-CUM-PUMPHOUSE, CONTROL ROOM, SUMP, PUMPROOM, SERVICE RESERVOIR, SUPPLY, DELIVERY AND ERECTION OF PUMPSETS, SUPPLY, DELIVERY, LAYING AND JOINTING OF PUMPING MAIN, BRANCH MAIN AND DISTRIBUTION SYSTEM INCLUDING COMMISSIONING AND MAINTENANCE OF THE SCHEME FOR A PERIOD OF ONE YEAR.
03-08-2010
நகராட்சி நிர்வாக இயக்குநகரம் - வேலூர் நகராட்சி -ஆழ்துளை கிணறு அமைத்து, மின்மோட்டார் மற்றும் சிண்டெக்ஸ் அமைத்தல்.
02-08-2010
CORPORATION OF CHENNAI - DEMOLITION AND RE-CONSTN OF BOX TYPE RCC SWD OF SIZE 1500MM BY 750MM ALONG PERAMBUR HIGH RD FROM PADDY FIELD ST TO SARASWATHI ST AND CONSTN OF NEW LINK DRAIN IN DN.37,Z-III.
30-07-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - CWSS TO MGR NAGAR & 3 OTHER HABITATIONS IN NARASINGAPURAM AND MUKUNDARAYAPURAM PANCHAYAT IN WALAJA UNION , (1.MGR NAGAR, 2.MALAIMEDU EAST OF NARASINGAPURAM PANCHAYAT AND 3) MALAIMEDU EAST ,4) MALAIMEDU WEST IN MUGUNTHARAYAPURAM PANCHAYAT), VELLORE DISTRICT. CONSTRUCTION OF PUMP ROOM 2 NOS ,,ERECTION OF SUBMERSIBLE PUMPSET , -2 NOS CONNECTING MAIN, INCLUDING ANCHORAGE ARRANGEMENTS ,PUMPING MAIN AND ALLIED CIVIL WORKS ETC COMPLETE., UNDER TURNKEY SYSTEM INCLUDING MAINTENANCE OF THE SCHEMES FOR TWO MONTHS.
28-07-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - PROVIDING SEWER COLLECTION SYSTEM SETTING UP OF SEWAGE TREATMENT PLANT STORM WATER DRAIN ARRANGEMENT AND RAIN WATER HARVESTING FACILITIES TO ERODE GH ETC COMPLETE INCLUDING.
28-07-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - CONSTRUCTION OF PRIMARY SLUDGE SUMP INCLUDING PUMPING ARRANGEMENTS AT KOYAMBEDU STP.
05-07-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROPOSED LAYING 1500 MM (I.D) PRE-CAST RCC ENCASING PIPE FOR A LENGTH 73.75 M BY PIPE JACKING / PUSHING METHOD ACROSS THE RAILWAY TRACK AT KM 7.996 AND SUPPLY & LAYING OF 500 MM DIA PSC SEWER PIPE INSIDE THE RCC ENCASING PIPE NEAR THIRUVOTTIYUR YARD ( MAS – GDR SECTION).
05-07-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROPOSED LAYING OF 1500 MM (I.D) PRE-CAST RCC ENCASING PIPE FOR A LENGTH OF 42.50 M BY PIPE JACKING / PUSHING METHOD ACROSS THE RAILWAY TRACKS AT KM 10.975 NEAR ROB NO.41C AND SUPPLY & LAYING OF 500 MM DIA PSC SEWER PIPE INSIDE THE RCC ENCASING PIPE BETWEEN WIMCO NAGAR AND ENNORE STATIONS.
05-07-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - PROPOSED LAYING OF 3.00M X 1.50M PRE-CAST RCC ENCASING BOX FOR A LENGTH OF 30 M BY BOX PUSHING AND JACKING METHOD ACROSS THE RAILWAY TRACKS AT KM TNPC / 18 -19 NEAR BRIDGE NO.2 AND SUPPLYING LAYING OF 500MM DIA AND 600MM DIA PSC SEWER PIPE INSIDE THE RCC BOX AT TNPM – TNPC SIDING LINE ( MAS – GDR SECTION).
29-06-2010
CORPORATION OF CHENNAI - CONSTRUCTION OF STORM WATER DRAIN WORKS IN VIRUGAMBAKKAM AND ARUMBAKKAM WATER SHED.
29-06-2010
CORPORATION OF CHENNAI - PROVIDING RE SECTIONING AND CONCRETE LINING TO EGGANGIPURAM CANAL AND TVS CANAL INCLUDING FENCING AND OTHER IMPT WORK IN OTTERI NALLAH WATER SHED.
29-06-2010
CORPORATION OF CHENNAI - PROVIDING RESECTIONING AND CONCRETE LINING TO CHELLAMMMAL CANAL JAFFERKHANPET CANAL ETC IN ADYAR WATER SHED.
29-06-2010
CORPORATION OF CHENNAI - PROVIDING,RE-SECTIONING AND CONCRETE LINING TO TRUSTPURAM CANAL INCLUDING FENCING AND OTHER IMPROVEMENT WORKS IN VIRUGAMBAKKAM AND ARUMBAKKAM WATER SHED, CHENNAI CITY.
29-06-2010
CORPORATION OF CHENNAI - CONSTRUCTION OF STORM WATER DRAIN WORKS IN ADYAR WATER SHED IN CHENNAI CITY.
29-06-2010
CORPORATION OF CHENNAI - CONSTRUCTION OF STORM WATER DRAIN WORKS IN OTTERI NALLAH WATER SHED IN CHENNAI CITY.
22-06-2010
CORPORATION OF CHENNAI - CONSTRUCTION OF 1200 BY 1200 MM SIZE STORM WATER DRAIN ALONG AYANAVARAM ROAD INSIDE METRO WATER LAND FROM RAJI STREET TO MEDAVAKKAM TANK ROAD IN DN 58 ZONE IV.
17-06-2010
MUNICIPAL ADMINISTRATION AND WATER SUPPLY - SALEM CITY MUNICIPAL CORPORATION - CONSTRUCTION OF MANKUTTAI STP 35 MLD ON DBOT BASIS.
17-06-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - IMPROVEMENTS TO THE SEWERAGE SYSTEM TO SAMIAR GARDEN.
14-06-2010
CORPORATION OF CHENNAI - CONSTRUCTION OF RCC BOX TYPE STORM WATER DRAIN OF SIZE 3FEET BY 3 FEET AND ROAD CROSS 4FEET BY 4 FEET ALONG THIRUVOTTIYUR HIGH ROAD (WESTERN SIDE) IN DN 12 ZONE I.
10-06-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - DIVERSION OF EXISTING SEWER MAINS FROM PROPOSED ROB AT BASIN BRIDGE IN DEPOT 32 IN AREA III.
04-06-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - COMBINED WATER SUPPLY SCHEME TO COIMBATORE LOCAL PLANNING AND RURAL AREAS WITH PILLUR RESERVOIR AS SOURCE STRENGTHENING OF CLEAR WATER TRANSMISSION MAIN BY REPLACING 1500MM.
03-06-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO RASIPURAM MUNICIPALITY IN NAMAKKAL DISTRICT - SUPPLY, DELIVERY, LAYING AND JOINTING AND TESTING OF TRANSMISSION MAIN FROM KANDARKULA-MANICKAM SUMP TO ATC DEPOT.
02-06-2010
பேரூராட்சிகள் இயக்கம் - பொன்னமராவதி தேர்வுநிலை பேரூராட்சி - பொன்னமராவதி பேரூராட்சி வார்டு எண் 9, பெருமாள் கோயில் வீதியில் 3 லட்சம் லிட்டர் கொள்ளளவு கொண்ட மேல்நிலை நீர்த்தேக்கத் தொட்டி கட்டுதல்.
01-06-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO PUNJAIPUGALUR TOWN PANCHAYAT IN KARUR DISTRICT CONSTRUCTION OF INFILTRATION WELL PUMPROOM SUPPLY DELIVERY AND ERECTION OF PUMPSETS SUPPLY DELIVERY LAYING AND JOINTING.
01-06-2010
CORPORATION OF CHENNAI - DISMANTLING EXISTING DAMAGED DRAIN OF SIZE 600 BY 750MM AND RECONSTRUCTION OF STORM WATER DRAIN OF SIZE 900 BY 900MM ALONG SAMYPAKTHAN STREET IN DN 59 Z IV.
01-06-2010
CORPORATION OF CHENNAI - TENDER FOR PROVIDING THIRD PARTY QAQC SERVICES FOR CONSTRUCTION OF STORM WATER DRAINS AND CANALS IN KOLATHUR WATER SHED AREA AND CAPTAIN COTTON CANAL WATER SHED AREA.
01-06-2010
CORPORATION OF CHENNAI - PROVIDING THIRD PARTY QAQC SERVICES FOR CONSTRUCTION OF STORM WATER DRAINS AND CANALS IN OTTERI NULLAH WATER SHED AREA.
01-06-2010
CORPORATION OF CHENNAI - PROVIDING THIRD PARTY QAQC SERVICES FOR CONSTRUCTION OF STORM WATER DRAINS AND CANALS IN MAMBALAM AND NANDANAM WATER SHED AREA.
01-06-2010
CORPORATION OF CHENNAI - PROVIDING THIRD PARTY QAQC SERVICES FOR CONSRUCTION OF STORM WATER DRAINS AND CANALS IN COOVUM ,VIRUGAMBAKKAM AND ARUMBAKKAM WATER SHED AREA.
01-06-2010
CORPORATION OF CHENNAI - PROVIDING THIRD PARTY QAQC SERVICES FOR CONSTRUCTION OF STORM WATER DRAINS AND CANALS IN ROYAPURAM, NORTH B CANAL,CENTRE B CANAL AND SOUTH B CANAL WATER SHED AREA.
01-06-2010
CORPORATION OF CHENNAI - PROVIDING THIRD PARTY QAQC SERVICES FOR CONSTRUCTION OF STORM WATER DRAINS AND CANALS ADYAR AND VELACHERY WATER SHED AREA.
25-05-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - DESIGNING, PROVIDING, CONSTRUCTING, ERECTING AND COMMISSIONING 48 MLD SEWAGE TREATMENT PLANT TAILORED TO TREAT 30 MLD BASED ON SEQUENTIAL BATCH REACTOR TECHNOLOGY AT DURGA ROA.
25-05-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - WSIS TO SRIMUSHNAM TOWN PANCHAYAT IN CUDDALORE DISTRICT.
24-05-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - OPERATION AND MAINTENANCE OF THE CENTRALISED CHEMICAL PLANT, CHLORINATION PLANT AND SLUDGE TREATMENT PLANT.
14-05-2010
SALEM CITY MUNICIPAL CORPORATION - PROVIDING UNDER GROUND SEWERAGE SCHEME (COLLECTION SYSTEM) TO SALEM CORPORATION (ZONE -2).
12-05-2010
நகராட்சி நிர்வாக இயக்குநகரம் - பல்லவபுரம் நகராட்சி - வார்டு எண். 23ல், உள்ள பகுதிகளிக்கு குடிநீர் பகிர்மான குழாய் அமைத்தல்.
12-05-2010
Tamil Nadu Water Supply and Drainage Board (TWAD) - Ramnad Mpty D system.
10-05-2010
TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD) - PROVIDING WATERTREATMENT PLANT FOR THE EXISTING CWSS TO KALIAKKAVILAI TOWN PANCHAYAT METHUKUMMAL VILLAGE PANCHAYAT AND 22 WAYSIDE VILLAGE PANCHAYAT AND CWSS TO KOLLENCODE TOWN PANCHAYAT EZHUDESAM TOWN PANCHAYAT AND 27 WAYSIDE VILLAGE PANCHAYAT AND NEW CWSS TO 79 HABITATIONS IN MELPURAM UNION IN KANYAKUMARI DISTRICTINCLUDING MAINTENANCE OF THE SCHEME FOR A PREIOD OF 12 MONTHS.
05-05-2010
MUNICIPAL ADMINISTRATION AND WATER SUPPLY- CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB)- CIVIL WORKS- RE-ROUTING AND LAYING OF 900MM DIA DI SEWER MAIN AT GRADE SEPARATOR AT PADI JUNCTION IN DEPOT- 63, AREA-IV.
04-05-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - CONSTRUCTION OF MINI SEWAGE PUMPING STATION AT KOYAMBEDU STP IN DEPOT 65 AREA.
04-05-2010
CORPORATION OF CHENNAI - CONSTUCTION OF SWD 2MBY2M ALONG ESPLANADE ROAD EASTERN SIDE DN.49 Z.3.
03-05-2010
CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB) - CIVIL WORKS - SHIFTING OF EXISTING 800MM DIA M.S. WITH 800MM DIA D.I., 450MM DIA D.I. AND 100MM DIA D.I. WATER MAINS FOR THE PROPOSED CONSTRUCTION OF GRADE SEPARATOR IN G.N.T. ROAD (MOOLAKADAI JUNCTION)
27-04-2010
நகராட்சி நிர்வாக இயக்குநகரம் - சிதம்பரம் நகராட்சி சின்னகாஜியார் தெரு மற்றும் ஜவஹர் தெரு மழைநீர் வடிகால் வாய்க்கால் அமைத்தல்.
22-04-2010
Municipal Administration and Water Supply- Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)- Civil Works- Empanelling Agencies for conducting third party inspection of MDPE and HDPE pipes and Plastic specials to ensure quality assurance.
21-04-2010
MUNICIPAL ADMINISTRATION AND WATER SUPPLY- CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB)- CERAMICS- SUPPLY AND DELIVERY OF 250MM DIA STONEWARE PIPE CONFORMING TO IS 651:2007 WITH ISI MARK
20-04-2010
MUNICIPAL ADMINISTRATION AND WATER SUPPLY-TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD (TWAD)- CIVIL WORKS-INVITATION FOR PREQUALIFICATION (REINVITATION) OF CONTRACTORS FOR PACKAGE III AND V OF HOGENAKKAL WATER SUPPLY AND FLUOROSIS MITIGATION PROJECT UNDER ICB.
06-04-2010
Municipal Administration and Water Supply- Corporation of Chennai- Civil Works- Providing,re-sectioning and Concrete lining to Captain Cotton , Link , kodungaiyur , vyasarpadi and Jawahar Canal including fencing andother impt.in Captain cotton canal WS
06-04-2010
Municipal Administration and Water Supply- Corporation of Chennai- Civil Works- Construction of storm water drain work in Captain Cotton Canal water shed, Chennai city
06-04-2010
Municipal Administration and Water Supply- Corporation of Chennai- Civil Works- Construction of storm water drain work in Cooum River Water shed, Chennai city
06-04-2010
Municipal Administration and Water Supply- Corporation of Chennai- Civil Works- Providing resectioning and concrete lining to Nungambakkam Canal including fencing and other improvement works in Cooum River Water shed , Chennai city
06-04-2010
MUNICIPAL ADMINISTRATION AND WATER SUPPLY- CHENNAI METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD (CMWSSB)- CHEMICALS/MINERALS- SUPPLY AND DELIVERY OF LIQUID CHLORINE IN A LARGE RETURNABLE CONTAINER GUARANTEED CHEMICALLY PURE CONFORMING TO IS SPECIFICATION 646:1986 TO ITS LATEST REVISION.
[1]